What it is
What a load bank test proves
A monthly exercise run with no load, or with a light building load, shows that a generator starts. It doesn't show that it can carry the load it was bought for. A load bank test connects a portable load bank to the generator's output and steps the load up while we watch voltage, frequency, oil pressure and coolant temperature.
Because the load bank, not the building, is the load, the facility can normally stay on utility power for the whole test.
- Annual load bank testsFor diesel emergency systems whose monthly exercise reaches neither 30 percent load nor the minimum exhaust temperature.
- Four-hour testsFor hospitals and other Level 1 systems that need a longer run on a set schedule.
- Wet stacking burn-offFor diesel units that run lightly loaded and build up unburned fuel in the exhaust.
- After repairs and new installsProof that a repaired or newly installed unit carries its rated load.
- Written resultsReadings recorded through the test for your files, inspector or insurer.
Why diesel units need it
Wet stacking in standby diesel generators
A diesel engine that runs at a small fraction of its rating never gets hot enough to burn all of its fuel. The unburned fuel and soot build up in the exhaust as a black, oily residue called wet stacking, which robs power and can leave the unit struggling when it finally sees a real load.
Running the generator at high load on a load bank burns that buildup off. Pairing load bank testing with a maintenance agreement keeps it from coming back.
Code requirements
NFPA 110 and hospital testing
NFPA 110 accepts a diesel emergency generator's monthly exercise if it runs at 30 percent or more of nameplate, or at a load that holds the manufacturer's minimum exhaust gas temperature. A unit whose monthly run meets neither is load bank tested once a year: 50 percent of nameplate for 30 minutes, then 75 percent for 60 minutes. Level 1 systems, which include hospitals, also need a four-hour run at least once every 36 months, which The Joint Commission requires of accredited hospitals.
Your authority having jurisdiction, your insurer and the code edition adopted for your site decide what applies to you. We test to the requirement you give us.
Questions
Frequently asked questions
How long does a generator load bank test take?
We commonly run two-hour and four-hour tests. The annual NFPA 110 test runs at 50 percent load for 30 minutes and then 75 percent for 60 minutes, plus setup time. Four-hour tests are for hospitals and other Level 1 systems.
Will we lose power during a load bank test?
Normally no. The load bank connects to the generator's output, so the building can stay on utility power while the generator is tested.
What is wet stacking?
Wet stacking is unburned fuel and soot that build up in the exhaust of a diesel engine that runs lightly loaded. Running the unit at high load on a load bank burns it off.
Do I need a load bank test every year?
Under NFPA 110, a diesel emergency generator needs an annual load bank test when its monthly exercise reaches neither 30 percent of nameplate nor the manufacturer's minimum exhaust gas temperature. Your authority having jurisdiction and your insurer have the final word for your site.
What size generators can you load bank test?
Standby generators up to 1,000 kW, diesel and gas, across Indiana.
Related services
More from Indiana Power
Serving all of Indiana from Tipton for over 38 years. See the cities we serve.